Progressive Energy, Mission Zero Technologies, and Airhive have joined forces to develop a 60,000-tonne-per-year direct air capture (DAC) facility as part of the industrial decarbonization cluster on Teesside in the UK.
According to the developers, the plant will represent one of the world’s largest facilities for capturing CO2 emissions directly from the atmosphere, creating local job opportunities and boosting the carbon dioxide removal (CDR) supply chain.
The ambitious project, called UnionDAC, brings together serious market players with extensive technological and DAC expertise.
As one of the creators, Progressive Energy will contribute to this collaboration with its expertise in developing and implementing projects that bring new, often technically challenging technologies to market.
The company also originated the development of the HyNet carbon capture and storage hub in the northwest of England, which is currently under development. Once online, this hub will also host power generation and low-carbon hydrogen projects.
Airhive and Mission Zero Technologies, on the other hand, carry professional insights and operational experience with DAC technology.
London-based Airhive has pioneered a low-cost DAC technology powered by fluidised beds and a mineral sorbent. Currently, the company operates a DAC facility at Teesside University’s Net Zero Industrial Innovation Centre, and to date, it has also successfully demonstrated its system at commercial scale in Alberta, Canada.

Relevant: Airhive Launches One Of The World’s Lowest-Cost DAC Technologies
Mission Zero Technologies, also a London native, specializes in electrochemical DAC technology development, with a focus on low costs and optimised energy requirements. The company operates the UK’s first commercial DAC plants in Sheffield and Norfolk, and its international reach includes a plant in Alberta, Canada.

The first phase of the UnionDAC project is expected to launch by 2030, with a projected combined capacity of 20,000 tonnes per year. In its second phase, scheduled for 2032, the project will expand to an additional 40,000 tonnes per year.
UnionDAC will be located within the Wilton International site on Teesside, and in the future, the project will connect to the carbon capture and storage infrastructure of the Northern Endurance Partnership.
Read more: Mission Zero Technologies Debuts Internationally By Launching A DAC Unit At Deep Sky Alpha








